PDA

View Full Version : Creating All day event and sync with Outlook produces a two day event



Nelson
10-19-2011, 01:53 PM
OK, there I was thinking the V 1.12.2 was begining to look good and the following happened.

DJO V1.12.2 and Companionlink V5 build 5002 with HTC Desire running Android 2.2

Created an all day event in DJO for Saturday 22/Oct, Time zone set to GMT, in UK.
Sync with Outlook using wireless sync (local WIFI) to PC running Outlook 2010
Entry in Outlook two days. Details in Outlook Start Fri 01:00 end Sun 00:00.
Local PC timezone (UTC) Dublin, Edinburgh, Lisbon, London and region set to UK
PC running Windows 7

Come on folks, we need to get these basics right!

Nelson
10-19-2011, 01:56 PM
And just in case it is relevant it the above was done at 21:50 today

Belinda
10-19-2011, 02:24 PM
Nelson -

This is fixed in version 1.12.3, posted as a beta today. We're sorry for the inconvenience.

Nelson
10-20-2011, 10:14 AM
OK, I'll load V 1.12.3

rscinc
11-01-2011, 06:18 AM
I am having the same problem. Droid Bionic, DJO 1.12.3, CL 5.0 build 5002. I set an all day event in DJO and after the sync, Outlook 2010 shows a two day event (5PM day one to 12AM day two) Outlook is "Arizona" time and DJO is "Mountain". Also if I start a new DJO all day event in this manner: +, enter subject, press the "From" date, press date, select date, press "All day" then ok, the event date in the main calendar add page is one day less than chosen. If I select the date, then press Ok and select "All day" from the main calender page, the date stays as selected.

Nelson
11-01-2011, 11:45 AM
rsinc - Sounds like a different problem due to different time zones.

Belinda - the original problem as specified is now solved. V1.12.3 + CompanionLink V5 Build 5004 works. Thanks.

Thomas
11-01-2011, 02:41 PM
rsinc - Sounds like a different problem due to different time zones.

Belinda - the original problem as specified is now solved. V1.12.3 + CompanionLink V5 Build 5004 works. Thanks.

Hello Nelson,

Glad to hear things are back to proper form in 1.12.3 with build 5004.

Odd
11-14-2011, 10:42 PM
I was having the same issue (Creating All day event and sync with Outlook produces a two day event) and resolved it using the information in this thread. Unfortunately I having a similar, yet new problem. Multi-day all day events are being shortened a day. For example, if the all day event is from Monday thru Friday it is shortened to Monday thru Thursday after a sync. The days don't seem to matter as I have an event from Thursday thru Sunday that is shortened to Thursday thru Saturday. Luckily I only have three multi-day all day events so I am able to ignore the issue (for now). Any thoughts on how to correct this issue?

LG Optimus V (VM670) running Android 2.2.2
DejaOffice version# 1.12.3
CompanionLink build # 5004
Data Manager App: Outlook
Sync Method: USB

Odd
11-15-2011, 04:24 PM
I was having the same issue (Creating All day event and sync with Outlook produces a two day event) and resolved it using the information in this thread. Unfortunately I having a similar, yet new problem. Multi-day all day events are being shortened a day. For example, if the all day event is from Monday thru Friday it is shortened to Monday thru Thursday after a sync. The days don't seem to matter as I have an event from Thursday thru Sunday that is shortened to Thursday thru Saturday. Luckily I only have three multi-day all day events so I am able to ignore the issue (for now). Any thoughts on how to correct this issue?

LG Optimus V (VM670) running Android 2.2.2
DejaOffice version# 1.12.3
CompanionLink build # 5004
Data Manager App: Outlook
Sync Method: USB